Tube Plug Data Sheet

Contact: Tube Plug End User:
Date:06/19/2013 Phone:
  Job #:


SCOPE OF APPLICATION AND SPECIFICATIONS
Number of Tubes: Type of Unit:





     
Number of Plugs Required:
Approximate Start Date:



TUBES
Material: Wall:
Yield: Wall Thickness/Gage:
Tensile: Actual Tube ID Measurement:
O.D.: U-Bend or Straight:
Type: Overall Tube Length:

Setting of Tube to Tubesheet Primary Face:
Are the Tubes to be Welded to the Tubesheet?



TUBESHEET
Total Thickness: Clad?
Material: Shell Attached?
Yield: Partition Plate?
Tensile:

Distance from Tubesheet Face and Outside of
Shell/Divider Plate(s)/Flange/Obstructions:
 
Shortest Distance Between Hole Center Line and Shell/Plate:



HOLES
Diameter:
Chamfer?
Chamfer Location:
Degree of Chamfer:
Chamfer Depth:



GROOVES
Number:
 NOTE: As a minimum, placement of the 1st groove should begin 1/2" from the face of the tubesheet or in the center based on tubesheet thickness.
TEMA?
 If "No", please provide specifications in the area below.
Customer Receptive to Hydraulic Expansion Groove?
 NOTE: Hydraulic expansion groove is a single wide groove (centered in sheet if possible).



LIGAMENT
Thickness:
Pitch:
Hole Pattern:



EXPANSION ZONE
Start of Expansion Inside Tubesheet:
Stop of Expansion Distance from Rear of Tubesheet:
Total Expansion Zone:



TUBE-TO-TUBESHEET WELD
Tubes to be Welded?
If Yes, how?
Maximum Counter Sink O.D. for the Weld:



EXPANDING PRESSURE REQUIREMENTS
Hydrotest Pressure:
When welding, the following expansion procedure is recommended:

    1. TubePro; setting of tube
    2. Weld
    3. Hydraulic Expand
          Note: No weld rollover is recommended



SPECIFICATIONS (IF APPLICABLE)

If you need to provide any additional drawings, sketches, blueprints, or performance requirements regarding working and test pressure of the vessel, please indicate below.

Will additional drawings be supplied?


EXTERNAL EXTENSIONS
For expansions which require going around an interference such as a channel, shell, partition plate, or any other obstruction, creating a situation where expansion would take place at a distance from the tubesheet face.

Distance from outside face of shell or plate to face of tubesheet:
Is there access for a stop collar at tubesheet face or outside of shell?